Room A118-102, 4th Floor, Joint Inspection Building, Haikou Comprehensive Bonded Zone, Haikou, Hainan.
D5 Configuration Sheet |
||||||
Project Name |
Building area: 28.05㎡(8500*3300*3300mm) |
|||||
No. |
Item Name |
Specification |
Unit |
Quantity |
Brand |
picture |
Ⅰ |
Skeleton structure |
|
|
|
|
|
1 |
Square tube (hot dip galvanized) |
100*100*3.75 |
t
|
2.005
|
|
|
50*100*2.75 |
|
|
||||
50*50*2.0 |
|
|
||||
20*40*2.0 |
|
|
||||
|
Steel plate support point |
20mm thick steel plate foot |
|
|
||
Ⅱ |
Enclosure structure |
|
|
|
|
|
1 |
Outer aluminum plate |
Aluminum 2.5mm thickness Electrostatic spraying process |
m² |
92.00 |
|
|
2 |
Wall insulation |
Polyurethane 70mm thickness |
Sets |
1.00 |
|
|
Floor insulation board |
Extruded plastic board thickness 50mm |
|
|
|
|
|
3 |
Accessories |
Containing crimping aluminum strip, adhesive tape, structural adhesive |
Sets |
1.00 |
|
|
Ⅲ |
Doors and windows |
|
|
|
|
|
1 |
Entrance door |
Zinc-Magnesium Entry Door 2.0 Thick Tin-Baking Paint |
set |
1.00 |
|
|
2 |
Entry door lock |
Intelligent fingerprint lock |
Set |
1.00 |
English version |
|
3 |
Bathroom door |
Minimalist titanium magnesium glass door |
set |
1.00 |
Inside opening or sliding, single door available |
|
4 |
Insulated Broken Bridge Door |
5+12Ar+5Low-E Tempered |
m² |
1.95 |
|
|
5 |
Aluminum alloy window in front cabin |
5+12Ar+5Low-E Tempered |
m² |
2.91 |
|
|
6 |
Aluminum window for bathroom |
5+12Ar+5Low-E frosted glass |
m² |
1.48 |
|
|
7 |
sliding screen |
Diamond mesh sliding screen fan |
set |
2.00 |
|
|
8 |
Balcony glass guardrail |
Balcony Glass 10mm Precision Ground Edge |
m² |
5.61 |
|
|
9 |
Curtain Wall Glass |
Glass 6+15A+6 LOWE argon gas filled |
m² |
15.63 |
|
|
Ⅳ |
Interior wall system |
|
|
|
|
|
4.1 |
Guest bedroom wall |
|
|
|
|
|
1 |
Base board |
Pine board / Blockboard thickness 15mm |
Sheet |
13.00 |
|
|
2 |
Top Board |
Bamboo fiberboard thickness 8mm |
Piece |
28.00 |
|
|
3 |
Accessories |
Including metal edge strips, structural adhesive, etc. |
Sets |
1.00 |
|
|
4.2 |
Bathroom wall |
|
|
|
|
|
1 |
Waterproof substrate |
Co-extruded board thickness 12mm |
Sheet |
9.00 |
|
|
2 |
Top layer board |
Bamboo fiber board thickness 8mm |
Piece |
19.00 |
|
|
3 |
Accessories |
Including edge strips, structural adhesive, etc. |
Sets |
1.00 |
|
|
Ⅴ |
Floor structure |
|
|
|
|
|
5.1 |
Living room bedroom floor |
|
|
|
|
|
1 |
Substrate |
Cement pressure plate thickness 18mm |
Sheet |
6.00 |
|
|
2 |
Top layer board |
Thickness of laminated wood flooring 12mm |
m² |
17.49 |
|
|
5.2 |
Balcony floor |
|
|
|
|
|
1 |
Surface plate |
Plastic wood flooring thickness 22mm |
m² |
4.46 |
|
|
5.3 |
Bathroom floor (Elevation -0.020) |
|
|
|
|
|
1 |
Subfloor |
Cement pressure plate thickness 18mm |
Sheet |
2.00 |
|
|
2 |
Tile surface |
Thickness 9mm |
piece |
28.00 |
|
|
3 |
Accessories |
including edge strips, structural adhesive, quick-drying adhesive, etc. |
Set |
1.00 |
|
|
VI |
Canopy structure |
|
|
|
|
|
6.1 |
Indoor ceiling |
|
|
|
|
|
1 |
Substrate board |
Pine board / Blockboard thickness 15mm |
Sheet |
6.00 |
|
|
2 |
Surface board |
Bamboo fiber board thickness 8mm |
block |
13.00 |
|
|
3 |
Accessories |
including edge strips, structural adhesive, etc. |
Set |
1.00 |
|
|
6.2 |
Balcony canopy |
|
|
|
|
|
1 |
Base board |
Waterproof board 1.2mm |
sheet |
2.00 |
|
|
2 |
Surface board |
Great Wall Board 20mm |
sheet |
7.00 |
|
|
3 |
Accessories |
including edge strips, structural adhesive, etc. |
Set |
1.00 |
|
|
Ⅶ |
electrical equipment installation |
|
|
|
|
|
7.1 |
Strong electricity system |
|
|
|
|
|
1 |
Distribution box |
|
1.00 |
Chint/Drexel |
|
|
|
Main switch |
|
|
1.00 |
|
|
|
Leakage protection |
|
|
6.00 |
|
|
|
Over-voltage protection |
|
|
1.00 |
|
|
2 |
Plug-in card system |
|
|
1.00 |
|
|
3 |
Transformer |
400W |
|
3.00 |
Drexel |
|
Transformer |
800W |
|
1.00 |
Drexel |
|
|
4 |
Switch |
|
|
6.00 |
|
|
5 |
Socket |
|
|
12.00 |
|
|
6 |
Wiring |
Power wiring BV-1.5² |
m |
300.00 |
Green Light Line/Up Up |
|
7 |
Wiring |
Power wiring BV-2.5² |
m |
300.00 |
|
|
8 |
Wiring |
Powerful wiring BV-4² |
m |
100.00 |
|
|
9 |
Wiring |
Strong power wiring BV-6² |
m |
10.00 |
|
|
10 |
Piping |
PVCφ16 |
Branch |
40.00 |
|
|
11 |
Piping |
PVCφ20 |
Branch |
5.00 |
|
|
12 |
Auxiliary materials for strong electric power |
Including junction box, waterproof tape, welding wire, etc. |
Set |
1.00 |
|
|
7.2 |
Weak power system |
|
|
|
|
|
1 |
Weak power distribution box |
|
1.00 |
|
|
|
2 |
Socket |
|
|
1.00 |
bull |
|
3 |
Wiring |
Cat6a network patch cable |
m |
10.00 |
|
|
4 |
Piping |
PVCφ20 |
m |
3.00 |
|
|
5 |
Auxiliary materials for weak electricity |
Crystal head |
set |
1.00 |
|
|
VIII |
Water Supply and Drainage Project |
|
|
|
|
|
8.1 |
Water supply system |
|
|
|
|
|
1 |
Water supply pipe |
PPR φ20 |
Branch |
5.00 |
uniplastic |
|
2 |
Elbow, tee |
|
|
22.00 |
|
|
3 |
Stop valve |
|
|
2.00 |
|
|
4 |
angle valve |
|
|
3.00 |
|
|
5 |
Whole house water supply heat preservation and protection system |
|
set |
1.00 |
|
|
6 |
Water Supply and Drainage Pipe Fitting Accessories |
|
set |
1.00 |
|
|
8.2 |
Drainage system |
|
|
|
|
|
1 |
Drainage pipe |
PVCφ110 |
Branch |
1.00 |
uniplastic |
|
2 |
Drainage pipe |
PVCφ75 |
branch |
1.00 |
uniplastic |
|
3 |
Drainage pipe |
PVCφ50 |
branch |
1.00 |
uniplastic |
|
4 |
Floor drain |
long drain |
|
1.00 |
|
|
5 |
Whole-house water-supply heat preservation and protection system |
|
Set |
1.00 |
|
|
6 |
Water Supply and Drainage Pipe Fitting Accessories |
|
set |
1.00 |
|
|
IX |
Lighting system |
|
|
|
|
|
9.1 |
Interior lighting |
|
|
|
|
|
1 |
Downlight |
|
|
6.00 |
|
|
2 |
Bedside Reading Lamp |
|
|
2.00 |
|
|
3 |
bracket light |
|
|
1.00 |
|
|
4 |
Strip light |
|
m |
20.00 |
|
|
5 |
Light strip aluminum profile |
|
m |
20.00 |
|
|
9.2 |
Exterior lighting |
|
|
|
|
|
1 |
Downlight |
|
|
2.00 |
|
|
2 |
Strips |
Waterproof strip, silicone sleeve |
m |
27.00 |
|
|
2 |
Sticker |
|
set |
1.00 |
|
|
X |
Sanitary ware |
|
|
|
|
|
1 |
Single-handle basin faucet |
Single-handle basin faucet |
set |
1.00 |
Germany Gulang L-4357 |
|
2 |
Single-handle shower |
(with digital display) (with shelf) |
Set |
1.00 |
Germany Gulang L-8562+L-5229 |
|
3 |
Intelligent Toilet |
(manual flip lid) 300 holes |
set |
1.00 |
GuLang-S260 |
|
|
cylindrical basin |
|
|
1.00 |
|
|
|
Rock Slab Moulding Countertop |
|
|
1.00 |
|
|
|
cosmetic mirror |
|
|
1.00 |
|
|
|
Bath heater |
Double ball motor + full plastic box 2450w + 16w lighting |
Set |
1.00 |
Aucma |
|
|
Bathroom tissue box |
Gunmetal Gray |
Set |
1.00 |
Germany Gu Lang L7152+L-7155 |
|
XI |
Equipment |
|
|
|
|
|
1 |
Central air-conditioner |
2p, including outlet air duct machine |
set |
1.00 |
Hisense |
|
2 |
Water heater |
50L |
|
1.00 |
Aucma |
|
Ⅻ |
Customized Cabinets |
|
|
|
|
|
1 |
bar cabinet |
|
set |
1.00 |
E0 grade multilayer board |
|
2 |
Small Closet Hanging Rod |
|
set |
1.00 |
|
Copyright © CDPH (Hainan) Company Limited All Rights Reserved